Keells Super, Matale – 92 kWp
The Keells Super branch in Matale features a 92 kW on-grid solar installation using 200 JA 460 panels. The system is powered by three ECO 27.0-3-S inverters and was commissioned on 22nd September 2022. This installation supports retail operations by lowering energy costs and promoting renewable energy usage.
92 kWp
ON GRID
200 MODULES
3 INVERTERS









