Central Expressway Meerigama Interchange
The solar installation at Mirigama Interchange in Mirigama features a 54.4 kW on-grid system using 136 JA 400W panels. The system is supported by two ECO 27.0-3-S inverters and is designed to enhance energy efficiency for infrastructure operations while reducing dependence on grid electricity. The project was completed and commissioned on 21st June 2023, when the system was successfully brought online.
54.4 kWp
ON GRID
136 MODULES
2 INVERTERS
Warning: Invalid argument supplied for foreach() in /var/www/vhosts/bamgreen.lk/httpdocs/wp-content/themes/divi-child/single.php on line 605









