by Admin-bam | Apr 23, 2026 | Industrial, Projects
Link Natural Products Pvt Ltd, situated along the Delgoda–Pugoda–Giridara Road in Kapugoda, implemented a 100.8 kW solar system with a 90 kW inverter capacity. The installation includes 360 panels rated at 280W and is supported by Eco 25.0-3-S and Symo 17.5-3-S...
by Admin-bam | Apr 23, 2026 | Industrial, Projects
Central Rubber (Pvt) Ltd, located within the Biyagama Export Processing Zone in Malwana, operates a 100.36 kW on-grid solar system with an inverter capacity of 102.5 kW. The installation consists of 386 panels rated at 260W and is supported by a combination of Eco...
by Admin-bam | Apr 23, 2026 | Industrial, Projects
The Miami Exports Star Garment facility in Buttala features a 100.36 kW solar system with four 25 kW inverters. The system uses Eco 25 inverters and was completed on 18th January 2017. It operates as an on-grid installation supporting garment production energy...
by Admin-bam | Apr 23, 2026 | Commercial, Projects
Dumbara Hotel, located in Arattenna Estate, Kandy, operates a 100.28 kW on-grid solar system. The inverter configuration consists of two 20 kW units and one 50 kW unit. The system was commissioned on 28th December 2023, contributing to energy efficiency and...
by Admin-bam | Apr 23, 2026 | Commercial, Projects
The government agricultural farm in Aluththarama, Mahiyanganaya, is equipped with a 96.32 kW solar system and an 80 kW inverter capacity. The system uses 172 Jinko 560W panels along with Solis S5 GR3P20K and Solis 60K inverters. It was commissioned on 25th June 2024...