by Admin-bam | Apr 23, 2026 | Commercial, Projects
The Keells Super outlet in Mahabage operates a 110.4 kW on-grid solar system with a 120 kW inverter capacity. The installation includes 320 panels rated at 345W and is supported by STP 60 inverters. Completed on 1st February 2018, the system enhances energy efficiency...
by Admin-bam | Apr 23, 2026 | Commercial, Projects
Located along Galle Road in Kalutara South, this Keells Super outlet operates a 107.64 kW solar system with a 120 kW inverter capacity. The installation includes 312 panels rated at 345W and uses STP 60 inverters. The project was completed on 2nd April 2018 as part of...
by Admin-bam | Apr 23, 2026 | Commercial, Projects
The Keells Super outlet in Kurunegala features a 106.4 kW solar system with an inverter capacity of 108 kW. The installation includes 336 panels rated at 350W and is supported by four Eco 27.0-3-S inverters. Completed on 12th October 2018, the system contributes to...
by Admin-bam | Apr 23, 2026 | Commercial, Projects
The Keells Super branch in Matale (second installation) operates a 104.88 kW on-grid solar system using 228 JA 460 panels. The system is powered by three ECO 27.0-3-S inverters and was commissioned on 9th May 2022. This installation supports efficient retail energy...
by Admin-bam | Apr 23, 2026 | Commercial, Projects
Located in Rathnapura, this Keells Super outlet features a 102.9 kW solar installation with an inverter capacity of 108 kW. The system uses 294 panels rated at 350W and is supported by four Eco 27.0-3-M inverters. Completed on 16th August 2018, the project enhances...
by Admin-bam | Apr 23, 2026 | Commercial, Projects
The Keells Super outlet in Horana operates a 101.6 kW on-grid solar system utilizing 254 JA 400 panels. The inverter setup includes Eco 27.0-S along with Symo 20.0-3-M and Symo 10.0-3-M units. Commissioned on 18th December 2020, the system supports retail operations...